Projects | an overview including Mining, Rail, Highway, Construction

Projects

HVC_CAT_760x760.jpg

Highland Valley Copper

CONSTRUCTION TIMELINE:
Ongoing multi year contract

SCOPE:
Primary: Horizontal Drain Hole Drilling

OWNER:
Teck Resources

PROJECT CHALLENGES:
Day to day operations on such a large site requires constant and consistent communication, not only with the crews, but, with the mine itself. This effort keeps all staff safe and able to go home to their families every night.

 

Highland Valley Copper Mine is the largest open pit mining operation in Canada. HVC is 100% owned and operated by Teck Resources, Canada’s largest diversified resource company.

For years BAT Construction has maintained an exceptional working relationship with Teck’s mining team.  Our scope of work at Highland Valley Copper includes:

        -Horizontal Drain Hole Drilling

        -Pit Water Management

        -Geo-technical Service Work

        -prism installations to monitor pit wall movement

        -rock scaling

        -pressure grouting

        -dam repairs

        -slab jacking

        -retaining walls

        -piezo hole drilling and installation

        -trim drilling and blasting

        -high angle excavation work

        -mesh and anchor installation

        -specialized grout and epoxy installations

        -shotcrete services

        -sump and pond lining installations

        -mine site water deliveries

        -various high angle rope access jobs as required.  

BAT Construction successfully installs over 40,000L/M of Horizontal Pit drains (HDH’s) at HVC annually. Our crews work closely with mine operations and planners to ensure production targets are met, and our operation is well aligned with HVC’s mining schedule, HSE standards, and budget. 

 

 

                                                                                  

 


RETURN