CONSTRUCTION TIMELINE:
Dec 2020
SCOPE:
Rope Access Construction
OWNER:
CN Rail
PROJECT CHALLENGES:
Working in a vertical shaft
Not disrupting rail traffic
Site Access
This Rope Access project required BAT Construction Ltd. crews access the CN Thornton ventilation tunnel to assist in the safe demolition of a cable tray and subsequent installation of additional cabling that was lowered into the shaft.
This was a short duration project for BAT.